Large Floating Terminal Deck Mounted Thruster Project

4 engines deck mounted azimuth thruster refitting project for 80000 tons floating terminal in Indonesia. After several times visiting and negotiating, we worked out the design as per ship owner requirements and solved their problem 

Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy